On Tuesday, February 11, there were 37 tradespeople on-site at 473! They were making things happen with drywall, wiring, concrete, welding, glass, insulation and more.
Most exciting: all the second floor windows along Oakwood Ave are installed.
Short Videos
Entering the Community Hall on the second floor (28 secs)
The busy crew working on the second floor (11 secs)
Welding the handrail on the main staircase (8 secs)
Drywalling (18 secs)